Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Involvement in IAEA ENVIRONET and research on overseas reference cases regarding environmental remediation of closed uranium mine

Saito, Hiroshi

JAEA-Review 2016-009, 80 Pages, 2016/07

JAEA-Review-2016-009.pdf:8.28MB

Environmental remediation has been conducted in closed Ningyo-toge Uranium Mine, after decades of mine-related activities. During the remediation, whole procedure, priority, necessary investigations and specific methods have been examined, and issues are clarified which should be solved in the future. For that, it has been recommended that opinions are exchanged among specialists in related fields overseas, and information and their experience are referred. As part of the activities, Ningyo-toge Environmental Engineering Center has been involved continuously in IAEA ENVIRONET, multinational network for environmental remediation. Also, bonds are tightened among participants and IAEA by exchanging opinions and sharing the issues. In parallel, literature survey has been conducted to supplement the information obtained through ENVIRONET and to clarify additionally-required information and targeted sites. The expected information are obtained from the site-visits and now being organized.

JAEA Reports

Environmental remediation for the upstream of Yotsugi Mill Tailings Pond, Ningyo-toge Uranium Mine

Saito, Hiroshi; Sato, Yasushi*; Sakamoto, Atsushi*; Torikai, Kazuyoshi; Fukushima, Shigeru; Sakao, Ryota; Taki, Tomihiro

JAEA-Technology 2015-063, 119 Pages, 2016/03

JAEA-Technology-2015-063.pdf:86.2MB

Ningyo-toge Environmental Engineering Center has been conducting environmental remediation of the Ningyo-toge Uranium Mine, after decades of mine-related activities were terminated. Its purposes are to take measures to ensure safety and radiation protection from the exposure pathways to humans in future, and to prevent the occurrence of mining pollution. As part of the remediation, upstream part of the Yotsugi Mill Tailings Pond, the highest prioritized facility, has been remediated to fiscal year 2012. Multi-layered capping has been constructed using natural material, after specifications and whole procedure being examined in terms of long-term stability, radiation protection, economics, etc. Monitoring has been carried out to confirm the effectiveness of the capping, in terms of settlement, dose and radon exhalation rates, etc. Monitoring of drainage volume of penetrated rainwater is planned. Accumulated data will be examined and used for remediation of downstream part of the Pond.

JAEA Reports

None

*;

PNC TN6510 94-001, 19 Pages, 1994/09

PNC-TN6510-94-001.pdf:0.65MB

no abstracts in English

JAEA Reports

None

; Asano, Tomohiro; *

PNC TN7420 92-018, 53 Pages, 1992/06

PNC-TN7420-92-018.pdf:1.4MB

None

JAEA Reports

None

Kurosawa, Ryuhei*

PNC TJ1615 91-002, 14 Pages, 1991/03

PNC-TJ1615-91-002.pdf:1.89MB

None

5 (Records 1-5 displayed on this page)
  • 1